12 Review the information displayed on the Pre-Installation Summary screen, and click Install.
The installer starts installing the various components. If the installation is successful, the URL for accessing
the vCenter Chargeback application is displayed.
13 Note this URL, and click Done.
The installer displays a dialog stating whether you want to generate your own SSL certificate.
14 Click Skip now, I'll generate it later.
The administrative account for accessing this instance will be same as the one used during the original
installation when the existing vCenter Chargeback database schema was created.
NOTE If the installation fails, the uninstaller starts automatically and removes all the components installed.
What to do next
You can also choose to generate an SSL certificate after the installation is complete by clicking Generate my
own SSL Certificate. If you choose to generate an SSL certificate, follow the instructions in “Generate an SSL
Certificate for vCenter Chargeback,” on page 18.
Upgrading vCenter Chargeback
You can upgrade your existing vCenter Chargeback setup to vCenter Chargeback 1.5.
You must, however, perform a few pre-upgrade tasks to ensure that the upgrade to vCenter Chargeback 1.5
is successful.
Pre-Upgrade Tasks for vCenter Chargeback
The pre-upgrade tasks ensure that you have a backup of the database and necessary configuration files. Also,
the completion of the pre-upgrade tasks ensures that vCenter Chargeback can function smoothly after the
upgrade is completed.
Prerequisites
In your current vCenter Chargeback installation, check and ensure that the following criteria are met.
n
No roles have names containing the prefix CBM_150_DEFAULT_ROLE_NAME_.
n
None of the LDAP users are assigned the Super User role.
n
None of the user names contain the prefix CBM_150_USER_.
Procedure
1 Check whether the data collector has synchronized all the vCenter Server hierarchies.
You can check the status and last run time for the data collector synchronization jobs from the Data
Collectors page of the Settings tab of the application. You can also browse the vCenter Server hierarchies
and vCenter Chargeback hierarchies in the application to verify whether the hierarchies are synchronized.
2 Stop all the vCenter Chargeback related services.
3 Take a backup of the existing vCenter Chargeback database.
If the upgrade fails due to some unforeseen reason and you are not able to use the existing setup either,
you can use the database backup to recover the data.
What to do next
After you have taken a backup of the database, you must purge the vCenter Chargeback database. See KB
1026068 (http://kb.vmware.com/kb/1026068) for further instructions.
Chapter 2 Installing vCenter Chargeback